New kitchen: what the plumber needs to plan

If you are replacing your kitchen, it affects water and drains. Here is what you should clarify before the kitchen is fitted.

Published by Rygge Rørleggerservice AS

Waste trap and water connections beneath a kitchen sink
Illustrative image

Placement of the sink and appliances

The sink, dishwasher and any fridge tap need a water supply and a drain. If you move them, the pipes must be moved. Settle the placement before the kitchen drawing is locked.

Drains and fall

Drains need a fall to flow away. That limits how far and how high they can be moved. The plumber can tell you what is possible before you order the fittings.

Stopcocks and connections

Use the opportunity to replace old stopcocks and flexible hoses. They are cheap to replace now, and important if something leaks later.

Timing

The plumber typically comes before the kitchen is fitted, and again for connection once the worktop is in place. Agree both visits in advance.

Ask us

Describe your situation, and we will get in touch.

What happens next

  1. You send the requestDescribe the job and where it is. Feel free to attach photos.
  2. We get in touchWe clarify the scope, any site visit and the timing.
  3. The job is done as agreedYou are told if anything changes along the way.

Tell us what you need

Describe the job and where it is. We get in touch once we have read your request. If it is urgent, call 69 26 80 00.

Fields marked * are required.

Photos of the leak, the bathroom or the installation make it easier to assess the job. Up to 3 photos. We reduce their size automatically before sending.

We use the information to reply, assess the job and follow it up. Read the privacy policy.